Bengaluru Adds Flyover, Adds Traffic Below It

Bengaluru Adds Flyover, Adds Traffic Below It

City completes elevated corridor, discovers the congestion simply acquired a second storey

BENGALURU, INDIA – The completion of a six kilometre elevated corridor through the city’s technology belt has delivered a measurable improvement in journey times for vehicles using the corridor, and no change whatsoever for the road beneath it, which now carries the same traffic in permanent shade.

Officials described the outcome as a success and the roadway below as a separate matter.

The Corridor Works and Ends Somewhere

The elevated section moves vehicles efficiently across its full length and deposits them at a junction that was congested before the corridor was built and is now congested with additional vehicles arriving faster.

Traffic engineers describe this as the terminal problem, and note that it is the single most predictable outcome in urban road construction and the one most reliably absent from project business cases.

You cannot build a funnel and be surprised by the narrow end, said transport researcher Dr Sudha Ranganathan-Fischer. The corridor is excellent. The corridor is not the network. We have improved one artery in a body that has a circulation problem, and the blood is arriving at the blockage sooner.

The Footpath Was in the Original Drawings

Project documentation included pedestrian provision along the surface road beneath the structure. Site inspection indicates the provision exists in sections, is interrupted by columns, and is used for parking across a substantial portion of its length.

The city has committed to enforcement. Enforcement has been committed to previously.

Urban infrastructure and municipal budget documentation is published by the Bruhat Bengaluru Mahanagara Palike, and national urban development and mobility policy research is maintained by NITI Aayog, whose reports on Indian urban transport have consistently emphasised network effects over corridor projects.

The Metro Is the Thing That Actually Moves People

The city’s rail network carries passenger volumes that no road project can approach, has expanded steadily, and generates a fraction of the political attention devoted to flyovers.

The reason is timeline. A flyover is delivered inside an electoral cycle. A metro line is delivered across three. One produces a ribbon. The other produces a construction hoarding that residents complain about for six years and then use daily for forty.

Everybody knows the metro is the answer, said Ranganathan-Fischer. The metro has always been the answer. The metro was the answer in 2005. We have built some of it. We are building more of it. And in between we keep building flyovers, because a flyover can be opened by somebody before an election and a tunnel cannot.

Observations From the Outer Ring Road

  • The technology corridor generates an enormous share of national software export revenue and is reached by a road that floods.
  • Every company on that corridor operates shuttle buses, meaning the private sector built a transit network because the public one was late.
  • The rain does not cause the flooding. The lake bed the road was built across causes the flooding. The rain simply arrives annually to point this out.
  • Nobody in this city gives a travel time. They give a departure time and a range.
  • The single most effective congestion measure ever deployed here was remote working, and it was implemented by accident and reversed by preference.

Relocation as a Substitute for Repair

Adding a structure rather than fixing a system is standard governance worldwide. British practice offered a precise parallel when a second seat of government was established rather than the first one being reformed, expanded shortly afterwards when the additional premises were confirmed as a regional solution.

Where physical works are not available, classification serves, as when a paint incident at a bank was assessed against counterterrorism legislation, an intervention requiring no construction whatsoever.

The comparative infrastructure record is kept at Bohiney Magazine, with the Westminster material at the British political desk archive.

The Next Corridor

A further elevated project has received approval. Its northern terminus is the junction at which the current corridor ends.

Ranganathan-Fischer has read the business case. She said it is thorough, competently prepared, and contains no section addressing what happens at the far end.

The Lake Beds Are Still on the Old Maps

Much of the city’s flood-prone development sits on the footprint of a historic network of interconnected tanks and lakes, engineered centuries ago to manage exactly the monsoon volumes that now arrive in living rooms.

The network was progressively built over as the city expanded, with drainage channels narrowed, diverted or enclosed. The water continues to follow the original topography, because water does not consult the land registry.

Restoration projects exist, several are genuinely effective, and they proceed at a pace determined by the difficulty of removing structures from land that people currently own and occupy.

Ranganathan-Fischer described the annual coverage as the most predictable content in Indian media. Every year the water goes to the same eleven places, she said. They are on a map from 1890. We could print the map in advance and save everybody the helicopter footage.

The corridor’s opening ceremony was held on a Sunday morning, when the junction at its northern end carries roughly a third of its weekday volume, producing photographs that residents have described as technically accurate and spiritually misleading.

Comparable reporting at The Beaverton.

SOURCE: https://bohiney.com/

Go to Original Source